Builder quote template

A free building quote template for builders, small construction firms and project managers. Price the job stage by stage, mark provisional and prime cost sums, set a payment schedule and say how variations are handled. Download it in Word or Excel, or load an example and fill it in online.

Load an example extension quote Download Word, Excel or PDF
Free PDF downloadNo signupTax and discount linesValidity date

Updated 10 November 2026

Download the free builder quote template

Editable in Word, Google Docs, Excel or Google Sheets, or print the PDF and fill it in by hand. No signup.

Builder quote template (UK)

Pounds, price by stage, provisional and prime cost sums, payment schedule, variations, VAT and reverse charge wording.

Start from an example:
Your details
PNG or JPG under 500 KB. Shown in the preview; added to the PDF with Pro.
Client details
Quote details
Line items
Subtotal0.00
Total0.00
Notes & terms
Accent colour
Live previewUpdates as you type

Pro, $9 one-time: no “Made with GetQuotationMaker” line, your logo on the PDF, and one-click invoice from any quote.

Get Pro

What a builder's quote includes

Building quotes are long because the work is. A reader should be able to check the total on the first page and the detail behind it on the next ones.

Quoting only the labour of a trade, with the client buying the materials? Use the labour quotation format: it has the fields, per-unit and day-rate pricing, and a free Word and Excel file.

Example: single-storey rear extension

A quote for a rear extension, laid out by stage. Prices are examples only.

StageAmount
Groundworks and foundations£7,800
Blockwork, brickwork and steel installation£11,200
Roof structure and covering£6,400
First and second fix: electrics and plumbing£4,900
Plastering and finishes£3,600
Provisional sum: drainage alterations (subject to survey)£1,500
Subtotal, excluding VAT£35,400
VAT at 20%£7,080
Total including VAT£42,480

Stage payments for the same job

Each payment follows a stage the client can see. The amounts below are percentages of the £35,400 subtotal, before VAT.

StageShareAmount
On acceptance, to book the start date10%£3,540
Groundworks and structure complete25%£8,850
Roof watertight25%£8,850
First fix complete25%£8,850
Completion and snagging done15%£5,310

A small final payment is a reason for the client to wait for snagging to be finished. Write what counts as complete next to each stage, for example that the roof is watertight when the covering and flashings are on.

Provisional sums and prime cost sums

Both are placeholders, but they mean different things, and mixing them up is how a quote turns into a dispute.

Provisional sumPrime cost sum
What it coversWork you cannot price yetAn item the client has not chosen yet
ExampleDrainage, subject to a surveyKitchen units, tiles, a sanitaryware set
What changesThe scope and price once the facts are knownThe price of the item, to match what is chosen
What stays fixedYour day rates and marginsYour fitting charge and handling margin
Where to write itIts own line, marked as subject to changeIts own line, with what the allowance buys

Load the loft conversion example to see a prime cost sum as a quote line.

VAT on building work

The guide to VAT on quotes shows how to lay out VAT on the page.

Building quote wording to copy

Replace everything in square brackets. This is general wording, not legal advice; have a solicitor check a contract for larger projects.

Project summary and exclusions

Project: [single-storey rear extension of about 20 square metres] at [address], for [client name].

Start: [date]. Expected duration: [14 weeks], depending on weather, access and decisions on provisional and prime cost items.

Not included: planning and building control fees, structural engineer, party wall costs, kitchen supply, decoration and flooring. We can quote any of these separately.

Provisional and prime cost sums

Provisional sums are allowances for work that cannot be priced until [a survey]. They are marked on the quote. The final price follows the work found, at the day rates in this quotation.

Prime cost sums are allowances for items you choose. If your choice costs more or less than the allowance, the difference is added to or taken off the price, and our fitting charge stays as quoted.

Variations, payment and validity

Variations: any change to the work above is priced in writing, with its effect on the end date, and agreed by you before we carry it out.

Payment: [10]% on acceptance, then on completion of each stage in the payment schedule. Invoices are due within [7] days.

This quotation is valid until [date]. To accept, sign and return it or reply to the email it came with.

When the quote is ready, send it with one of our quote email templates. Give the client clear quote acceptance wording, and use the steps in confirm a quotation once they say yes. If quotes are not turning into jobs, improve your quote acceptance rate with the nine changes in that guide.

For smaller jobs use the contractor and tradesman quote template; for the plumbing inside a build, the plumber quote template has the call-out and guarantee lines.

Frequently asked questions

What should a builder's quote include?

A project summary with start date and duration, the price broken down by stage, provisional and prime cost sums marked as such, exclusions, a payment schedule tied to stages, how variations are handled, the VAT treatment and a valid-until date.

What is a provisional sum in a building quote?

An allowance for work that cannot be priced yet, such as drainage that depends on a survey. It is marked as subject to change, and the final price follows the work that is actually needed.

What is a prime cost sum?

An allowance for an item the client has not chosen yet, such as a kitchen or tiles. The final price follows what is chosen. Your fitting charge and handling margin stay as quoted.

How should stage payments be set for building work?

Tie each payment to a stage the client can see, such as groundworks complete or roof watertight, and keep a final share for completion and snagging. Avoid asking for a large sum far ahead of the work.

How do I handle changes to the work once the client accepts?

Add a variations clause: any change is priced in writing, with the effect on the end date, and agreed before it is carried out. Send the price each time, so nothing is settled by memory at the end.

Do I charge VAT on building work?

If you are VAT registered, most building work on a home is standard-rated at 20%, with zero or reduced rates for some jobs, and the domestic reverse charge applies to many supplies between VAT-registered businesses in the Construction Industry Scheme. Check the GOV.UK pages linked above for your job.

Is this builder quote template free?

Yes. Download the Word or Excel version, or fill it in online and download a PDF. No signup. The Excel version adds up the lines, VAT and total for you.