Labour quotation format for labour-only work

A labour quotation prices work done by people, while the client buys the materials. This page gives the format field by field, shows how to price labour per unit, per day or per hour, and has three worked examples (UK, UAE, India) that load into the quote maker. A free Word and Excel template is below.

See the format Open an example in the quote maker

Updated 10 November 2026

The short answer: a labour quotation is a written price for work done by people only. It names the task, the unit (square foot, square metre, running metre, day or hour), the quantity, the rate and the total, and it says who supplies the materials, tools and access. The format is: header, scope, rate table, what is not included, payment, validity and acceptance.

What goes in a labour quotation

The format is a normal quote with two additions: a clear line on who buys the materials, and a statement of how the final bill is measured. Use these fields in this order.

FieldWhat to writeWhy it matters
HeaderYour name, address, phone and tax or registration number. Client name, site address, quote number, date.The client can file the quote, and a registered business shows its tax number.
Scope of labourThe tasks in plain words: “floor tiling, labour only, kitchen and hall, about 38 sq m”.Stops an argument later about what “labour” included.
Unit and quantitySquare foot, square metre, running metre, day, hour or lump sum, with the quantity.The price follows the measured work.
Rate and amountRate per unit before tax, and the amount (quantity times rate).The client can compare your rates line by line.
Materials and toolsWho supplies materials, consumables, scaffolding, power tools, water and electricity.The most common dispute on a labour-only job.
Quantities basis“Estimated; the final bill uses measured quantities.”Lets the price move with the real area, in both directions.
Not includedHidden defects, extra visits, work at height, waiting time, work by other trades.Protects you from unpaid extras.
Working timeHours per day, overtime rate, weekend work, number of workers.Makes the day rate and the schedule clear.
PaymentAdvance, running bills for work measured to date, final payment on completion.Keeps your cash flow safe on a job with no materials to resell.
TaxA tax line, or a statement that tax is not charged, with the tax numbers.See the tax lines below.
Validity and acceptanceDays the price holds, and how the client says yes.See quote acceptance wording.

Labour only, supply and fit, or full contract: which one are you quoting?

The same trade can be quoted three ways. Decide which one before you write the first line, because the rate table looks different for each.

Labour onlySupply and fitFull contract
What the price coversWork by people, sometimes with their toolsMaterials and the work to fit themAll trades, materials and site management
Who buys the materialsThe clientYouYou
How you price itPer unit of measured work, per day or per hourA materials list plus labour linesStage prices with provisional and prime cost sums
Main riskQuantities, waiting time, the quality of materials you did not chooseMaterial prices moving before the jobScope growing without a price change
Template to start fromThis pageContractor quote templateBuilder quote template

How do you price labour: per unit, per day or per hour?

MethodUse it whenHow the price is built
Per unit of measured workRepeatable work with a clear quantity: tiling, plastering, painting, brickwork, board fixingRate per sq ft, sq m or running metre times the measured quantity
Day rateThe work is hard to measure first, or you are supplying a crewWorkers times days times the day rate, with working hours stated
Hourly rateRepairs and small jobs where the scope is not knownHours times the hourly rate, with a minimum charge and a limit that needs the client’s approval to pass
Lump sumA small task that is fully definedOne price for the named task

To set a day rate, start from what you need to earn and how many days you can really bill. For example, if you need £36,000 a year from the work and can bill 190 days, the pay part of the day rate is about £189 (36,000 divided by 190) before tools, insurance, travel and profit. Our guide to pricing a job quote works through the overheads and the margin.

Three worked examples you can load

Prices are illustrations, not market rates. Each button loads the example into the quote maker, where you change the lines, the currency and the tax.

United Kingdom: tiling labour at a day rate, with VAT

DescriptionQtyRateAmount
Tiling labour, per tiler per day (2 tilers for 3 days)6£190£1,140
Preparing walls and floor, per day (1 labourer)1£140£140
Grouting, sealing and clean down, lump sum1£120£120
Subtotal, excluding VAT£1,400
VAT at 20%£280
Total including VAT£1,680

United Arab Emirates: fit-out labour per square metre, with 5% VAT

DescriptionQtyRateAmount
Gypsum partition framing, labour only, per sq m120AED 38AED 4,560
Gypsum board fixing and jointing, labour only, per sq m240AED 22AED 5,280
Painting, 2 coats, labour only, per sq m300AED 14AED 4,200
Subtotal before VATAED 14,040
VAT at 5%AED 702
Total including VATAED 14,742

India: flooring labour per square foot, with 18% GST

DescriptionQtyRateAmount
Vitrified tile laying, 2 x 2 ft, labour only, per sq ft850₹24₹20,400
Wall putty, 2 coats, labour only, per sq ft2,200₹9₹19,800
Skirting fixing, labour only, per running ft300₹15₹4,500
Debris removal and site clean up, lump sum1₹2,500₹2,500
Subtotal before GST₹47,200
GST at 18%₹8,496
Total including GST₹55,696

Wording to copy into a labour quotation

Change the square brackets to fit the job. This is a starting point, not legal advice; for a large contract, have it checked.

When the quote is ready, send it with one of our quote email templates and ask for a written yes using the acceptance wording.

Tax lines on a labour quotation: UK, UAE and India

Rules and rates below were read on the official pages linked beside them on 10 November 2026. Tax rules change and depend on what you sell; check with the tax authority or an accountant.

Free labour quotation template in Word and Excel

A one-page labour-only template with the fields above, an example row, a terms block and a signature line. The Excel file adds up the lines for you; fill in the yellow cells.

Or load one of the examples above and download the quote as a PDF from the quote maker.

Start from an example:
Your details
PNG or JPG under 500 KB. Shown in the preview; added to the PDF with Pro.
Client details
Quote details
Line items
Subtotal0.00
Total0.00
Notes & terms
Accent colour
Live previewUpdates as you type

Pro, $9 one-time: no “Made with GetQuotationMaker” line, your logo on the PDF, and one-click invoice from any quote.

Get Pro

Questions

What is a labour quotation?

A written price for work done by people only. It lists the tasks, the unit and quantity, the rate and the total, and it states that the client supplies the materials, tools and access.

What is the format of a labour contractor quotation?

Header with both parties and a quote number, a scope of labour, a table of tasks with unit, quantity, rate and amount, a line on who supplies materials, what is not included, payment terms, a tax line, a validity period and an acceptance block.

What is the difference between a labour quote and a full quote?

A labour quote covers the work only and the client buys the materials. A full quote, or supply and fit, includes the materials, so it has a materials list or allowance and a different risk if material prices change.

Should I price labour per square foot or per day?

Per unit of measured work suits repeatable jobs with a clear quantity, such as tiling or plastering. A day rate suits work that is hard to measure first or when you supply a crew. State the working hours with a day rate.

Do I charge VAT or GST on a labour-only quotation?

If you are registered for VAT or GST, yes, unless a special rule applies, such as the UK domestic reverse charge for construction services. If you are not registered, set the tax rate to 0 and do not mention tax. Check the rate for your work with the tax authority.

What happens if the client's materials are not ready?

Say in the quote that waiting time is charged at the day rate, and that the materials must be on site before work starts. That puts the cost of the delay on the side that caused it.