What the contractor quote template includes
The Word, Excel and PDF versions share one layout, the same layout the online quote maker produces. Fill in the parts that apply to your job:
| Section | What to put in it |
|---|---|
| Your details | Business name, address, phone, email. Your VAT number if you are VAT registered (UK), or your licence number where your state or country requires one. |
| Client and site | Client name, billing address and the site address if it is different. |
| Quote number, date, valid until | A unique number such as Q-2026-031, so the quote, emails and invoice all match. |
| Scope of work | A plain description of the job, the rooms or areas, and the finish the client will get. |
| Itemised price | Labour, materials, plant or equipment hire, subcontractors and waste removal on separate lines, each with a quantity and rate. |
| Exclusions | What is not included: decorating, permits, making good after other trades, hidden defects. |
| Tax | A VAT, GST or sales tax line under the subtotal, and the total including tax. |
| Payment terms | Deposit, stage payments and when the balance is due. |
| Variations | How changes are priced and agreed: in writing, before the work. |
| Acceptance | How the client accepts, with a signature and date line. |
The Excel version adds the totals for you: enter quantities and rates in the yellow cells and the line amounts, subtotal, tax and total update. The Word and PDF versions are for typing or writing in by hand.
Example: a UK tradesman quote
A small refit job priced with the UK tradesman template. Prices are examples only.
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labour: remove existing units and prepare walls (days) | 2 | £320.00 | £640.00 |
| Labour: installation and first fix (days) | 3 | £320.00 | £960.00 |
| Materials: timber, fixings, adhesives and sealants | 1 | £485.00 | £485.00 |
| Skip hire and waste removal | 1 | £260.00 | £260.00 |
| Making good and clean down on completion | 1 | £140.00 | £140.00 |
| Subtotal | £2,485.00 | ||
| VAT at 20% | £497.00 | ||
| Total including VAT | £2,982.00 | ||
UK tradesman quotes: VAT, consumer prices and cancellation
- Only add VAT if you are VAT registered. The standard rate is 20% (GOV.UK VAT rates). You must register once your taxable turnover goes over £90,000 in the last 12 months (GOV.UK: register for VAT). If you are not registered, set the tax line to 0 and don’t mention VAT.
- Show the net price, the VAT and the total as separate lines, and add your VAT number. It isn’t an invoice, but the client can check the figures will match the VAT invoice later.
- Homeowners should see the full price up front. UK guidance says prices for consumers must include VAT and any other mandatory charges (CMA price transparency guidance). Lead with the VAT-inclusive total.
- Quote or estimate? Citizens Advice describes a quote as "a promise to do work at an agreed price" and an estimate as "the trader’s best guess" (Citizens Advice). Call it a quote only if the price is fixed for the work described.
- Jobs agreed at the customer’s home. A consumer who agrees a contract away from your premises generally has 14 days to cancel a services contract (Consumer Contracts Regulations 2013; Citizens Advice on cancelling building work).
Last checked 7 October 2026. General information, not legal or tax advice.
Payment terms you can copy
Payment terms wording
Payment terms: a deposit of [25%] ([amount]) is due on acceptance to book the start date and order materials. The balance is due within [7] days of completion, by bank transfer to [account name, sort code, account number].
For larger jobs: [20%] deposit on acceptance, [40%] on completion of [first fix], [40%] on completion.
Any work not listed in this quote will be priced and agreed with you in writing before it is carried out.
Validity and exclusions wording
Validity and exclusions
This quotation is valid for [30] days from the date above. After that, prices may change to reflect current material costs.
Not included: [decorating; building control or planning fees; skip permits; making good after other trades]. Hidden defects found once work starts, for example rotten timbers or faulty existing wiring, are not included and will be quoted separately before any extra work is done.
Contractor quotation format
For bigger jobs, set the quote out so the client can compare it line by line with other bids:
- Project and site details: address, a short description of the work and the date of your site visit.
- Itemised work: each stage or task with quantity, unit (m², sq ft, linear metre, day), rate and amount.
- Materials: itemised or as an allowance, and who supplies what.
- Exclusions: permits, skip hire, making good after other trades, unforeseen structural work.
- Stage payments: tied to stages that are easy to check, never a large sum far ahead of the work.
- Variations or change orders: priced and signed off in writing before the work.
- Validity, start date and duration.
Labour contractor quotation format (labour only)
When the client supplies materials, quote labour by unit of work so the price follows the measured quantities. Example rates in rupees; change the currency in the quote maker.
| Work item (labour only) | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Brickwork, 9 inch wall | sq ft | 450 | ₹32 | ₹14,400 |
| Internal plastering | sq ft | 1,200 | ₹18 | ₹21,600 |
| Floor tiling | sq ft | 380 | ₹28 | ₹10,640 |
| Site cleaning and debris stacking | lump sum | 1 | ₹3,500 | ₹3,500 |
| Total labour (before GST) | ₹50,140 | |||
State clearly that materials, scaffolding, water and electricity are supplied by the client, that the final bill uses measured quantities, and who clears the site. In India the standard GST rate is 18% (PIB, 56th GST Council); confirm the rate that applies to your work.
Carpentry and joinery quotes
Carpenters usually price per item (per door hung, per window board), per linear metre (skirting, architrave, worktops) or per piece for fitted furniture. Say who supplies the timber and ironmongery, whether the price includes finishing or painting, and how long fitted pieces take to make.
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Supply and hang internal doors, including hinges and handles | 5 | £145 | £725 |
| Fit new architrave and skirting (linear metres) | 38 | £12 | £456 |
| Fitted alcove cupboards in MDF, primed | 2 | £680 | £1,360 |
| Collection of materials and waste removal | 1 | £90 | £90 |
| Subtotal (VAT added if registered) | £2,631 | ||
Sending the quote and getting a yes
Send the PDF with a short email that states the total, what it covers and how to accept. Copy one of our quote email templates, and when the client says yes, confirm it in writing with the quote acceptance wording. Building a larger project quote with provisional sums? See the builder quote template.