Guide

What is a quotation in business?

Updated 9 October 20266 min read

A quotation (or quote) is a document a business sends before a sale or a job, offering to supply specific goods or services at a stated price, usually until a stated date. If the customer accepts it, the quote normally becomes the agreed price and scope for the job.

It is not an estimate, which is a best guess that can change, and not an invoice, which asks for payment once the work is done. Citizens Advice puts the first difference plainly: a quote is “a promise to do work at an agreed price”, an estimate is “the trader’s best guess” (Citizens Advice).

What a quotation looks like

A quotation from a fencing contractor to a homeowner, with each part numbered. The business, the customer, the prices and the dates are made up.

1QUOTATION Q-2026-114212 October 2026, valid until 11 November 2026

3From Brookside Fencing Ltd, Mill Lane, Harrogate. VAT no. GB 000 0000 00

4For Sam Taylor, Orchard Close, Harrogate

5Replace the 11 m rear boundary fence and the side gate, as discussed on site on 9 October.

6DescriptionQtyRateAmount
Remove old fence and posts and take them away (metres)11£12.00£132.00
Concrete posts and gravel boards, supplied and set in concrete7£58.00£406.00
1.8 m featheredge panels, supplied and fitted6£96.00£576.00
Side gate with latch, supplied and hung1£245.00£245.00
Waste removal1£85.00£85.00
Subtotal£1,444.00
VAT 20%£288.80
7Total including VAT£1,732.80

8Not included: moving plants along the fence line, work on the neighbour’s side, and pipes or cables that were not pointed out to us before work starts.

9Payment: £300 deposit to book a date, balance within 7 days of completion by bank transfer.

10To accept: reply to the email this quote came with, or sign and return it. Signed ______________ Date __________

What each part is for

  1. Title and quote number. “Quotation” tells the customer this is an offer, not a bill. The number identifies this exact version, and it becomes the reference on the invoice later.
  2. Date and valid-until date. When the price was given and how long it stands. After that date you can re-quote at current prices.
  3. Your details. Legal or trading name, address and contact details, plus your VAT number if you are registered.
  4. The customer’s details. Who the offer is made to. For a company, use its legal name.
  5. Scope. A sentence or two on what the job is and where, so the lines make sense to someone who wasn’t at the site visit, such as a partner or an accounts team.
  6. Line items. Each piece of work or product with a quantity, a rate and a line total. Itemising shows what the money buys and lets the customer change one item instead of turning down the whole quote.
  7. Tax and total. Subtotal, VAT and total. A homeowner should see the total including VAT; a business compares prices before VAT (VAT on quotes).
  8. Exclusions. What the price does not cover. Most arguments about a quoted job start with something each side assumed differently.
  9. Payment terms. Any deposit, when the balance is due and how to pay.
  10. How to accept. One clear action: reply, sign or pay the deposit (acceptance wording to put on a quote).

Quotation, estimate, pro forma, invoice: which is which

DocumentSent byWhenIs the price fixed?
Request for quotation (RFQ)BuyerBefore choosing a supplierNo price yet: it asks suppliers to quote for a stated need
QuotationSellerBefore the work or saleYes, for the work described, until the valid-until date
EstimateSellerBefore the work, when the scope is uncertainNo: a best guess that can change
ProposalSellerBefore larger or advisory workUsually contains a quote, plus the approach and timetable
Tender (bid)SellerIn reply to a formal invitation to tenderYes, in the buyer’s format and on the buyer’s terms
Purchase orderBuyerAfter accepting a quoteConfirms the order and price; put its number on your invoice
Order confirmationSellerAfter the acceptance or purchase orderYes, the accepted price, with the dates and terms that apply (how confirming a quotation works)
Pro forma invoiceSellerBefore supply, when payment comes firstYes. In the UK it is not a VAT invoice and should say so (VAT Notice 700, 17.3)
InvoiceSellerAfter the work, or at an agreed stageAsks for the agreed price plus any agreed extras

Turning an accepted quote into the invoice, with deposits and extras, is shown step by step in how to convert a quote to an invoice.

When to send a quote and when an estimate

Ways to price a quotation

FormatHow the price is setSuits
Fixed priceOne total for a defined scopeSmall, well-defined jobs
ItemisedA price per line, adding up to the totalMost trade and project work
OptionsTwo or three versions, each with its own totalLetting the customer choose the specification
Rate-basedA rate per hour, day, m² or unit, with an estimated quantityWork measured on completion
With allowancesFixed prices plus provisional sums for unknownsBuilding work with hidden conditions

When a quotation binds you

A quote is an offer. When the customer accepts it as written, before it expires, that normally forms an agreement: you do the work described and they pay the quoted price. Three things follow from that:

Acceptance wording, the 14-day cancellation right for jobs agreed at a customer’s home, and accepting only part of a quote are covered in quote acceptance wording.

How long a quotation lasts

As long as the date on it says. Pick a period that suits your costs, such as 30 days, or 14 to 21 days if your material prices move quickly. A quote without a date leaves it unclear how long the price stands. If you need to change a quote before it is accepted, send a revised version with a new revision number (Q-2026-114 rev. 2) and say that it replaces the earlier one.

Sources checked 9 October 2026: Citizens Advice; Consumer Rights Act 2015, s.50; HMRC VAT Notice 700 (updated 25 June 2026). General information, not legal advice.

Make a quotation like the example

Free quotation maker: quote number, line items, VAT, a valid-until date and your terms, downloaded as a PDF. No signup.

Open the example in the quote maker

Questions

Is a quotation the same as an invoice?

No. A quotation offers a price before the work; an invoice asks for payment after it, or at an agreed stage. Once a quote is accepted, the invoice should match it line for line, plus any extras the customer agreed.

Is a quotation legally binding?

It becomes binding when the customer accepts it as written, before it expires. Until then it is an offer, and a reply that accepts with changes is a counter-offer that binds nobody until the other side agrees.

What is the difference between a quotation and an estimate?

A quotation is a fixed price for the work described. An estimate is a best guess that can change. Citizens Advice describes a quote as "a promise to do work at an agreed price" and an estimate as "the trader’s best guess".

What is a quotation number?

A unique reference for each quote, such as Q-2026-114. It identifies the exact version the customer accepted, and it is quoted on the invoice later. Number quotes in their own sequence, separate from invoices.

Does a quotation need to include VAT?

If you are VAT registered, show the VAT rate, the VAT amount and the total including VAT. If you are not registered, don’t add VAT. A price that does not mention VAT is treated as including it.

Related guides

How-toHow to convert a quote to an invoiceTemplatesQuote acceptance wordingGuideHow to write a professional quote